We keep construction

programmes on track.

Primavera P6 baselines, progress controls, cash-flow forecasting, and delay analysis the planning back-office that contractors and consultants rely on across the Kingdom

10+ yrs senior engineers

ISO 19650 BIM workflow

SBC compliant

Riyadh + Egypt office

Overview

Planning, scheduling, and project controls run as an extension of your technical office.

A programme is only as useful as the discipline behind it. BIMLEED builds the baseline schedule, keeps it current every period, and turns site progress into the numbers your management and your client actually act on earned value, cash flow, look-aheads, and forecast completion.

We work as the planning and controls desk behind contractors, consultants, and project owners from tender-stage programmes and BOQ-linked scheduling through monthly progress reporting and, when a job drifts off baseline, recovery planning and fully substantiated extension of time claims.

Scope

What we deliver

01

Scheduling Baseline programme & WBS

02

Monitoring Progress updates & look-aheads

Earned value & cost control

03

04

05

06

07

08

Cash flow & S-curves

Delay analysis & EOT claims

4D BIM scheduling

Dashboards & reporting whole project, on one screen.

Live web / Power BI controls dashboard (auto-updating)

workflow

Our Process

Mobilise & set up

Build the baseline

Monitor & update

Report & forecast

Recover & defend

From mobilisation to recovery — five stages.

Review contract, BOQ, drawings, and milestones; agree the reporting calendar, WBS, and activity coding.

Develop the logic-linked, resource- and cost-loaded programme and baseline S-curve; issue for client approval.

Collect site progress, update the programme each period, and issue look-aheads with variance analysis.

Publish progress reports, earned value, and cash flow; forecast completion and flag slippage early.

Model recovery scenarios when needed and prepare delay analysis and EOT claims with full substantiation.

Compliance

Standards & software

Primavera P6, Microsoft Project, Excel, Power BI, Synchro 4D, Navisworks Manage

AACE International, MI& PMBOK, SCL Delay Protocol, FIDIC time provisions, Forensic schedule analysis

Have a programme to build or recover?

Send us the contract programme, BOQ, and drawings. We'll set up the baseline and controls and keep them current every reporting period.

Riyadh, Saudi Arabia

Build Green. Build Right.
Engineering services for construction projects across Saudi Arabia and the GCC.

© 2026 BIMLEED. All rights reserved.