Healthcare

Al Amal Hospital

The densest ceiling void in construction, cleared before a hanger went up. Architecture, structure and MEP federated into one model, and every service zone closed out digitally before installation began.

BIM coordinationMechanicalElectricalStructural designArchitectural
Rendered street elevation of the medical centre.

At a glance

Location
Abha, KSA
Scope
Interior design + BIM

Outcome

The brief

Healthcare service zones carry medical gas, HVAC, drainage, power and data through the same corridors, with no tolerance for a clash found on site.

The constraint

Every service in a hospital corridor sits on another trade's critical path. One conflict found at installation does not stop one crew; it stops the crews on either side of it as well.

What we delivered

  • Federated BIM model assembled from the architectural, structural and MEP disciplines
  • Systematic clash detection across every service zone in Navisworks
  • Conflicts resolved digitally before installation began
  • Coordinated ceiling-void sections issued to each trade contractor
  • As-built model maintained through construction for facility handover

Project images

Send us one package.

Send a package and you get a scope, a fixed price and a delivery date within two working days.