Al Amal Hospital
The densest ceiling void in construction, cleared before a hanger went up. Architecture, structure and MEP federated into one model, and every service zone closed out digitally before installation began.
At a glance
- Location
- Abha, KSA
- Scope
- Interior design + BIM
Outcome
The brief
Healthcare service zones carry medical gas, HVAC, drainage, power and data through the same corridors, with no tolerance for a clash found on site.
The constraint
Every service in a hospital corridor sits on another trade's critical path. One conflict found at installation does not stop one crew; it stops the crews on either side of it as well.
What we delivered
- Federated BIM model assembled from the architectural, structural and MEP disciplines
- Systematic clash detection across every service zone in Navisworks
- Conflicts resolved digitally before installation began
- Coordinated ceiling-void sections issued to each trade contractor
- As-built model maintained through construction for facility handover
Project images





Related projects

SBF Factory
Factory buildings designed across architecture, structure, MEP and Civil Defense systems, with a coordinated IFC model and design visuals…IndustrialRiyadh, KSA
Qortoba Offices
Electrical design for an office building in Riyadh: power distribution from the ground-floor electrical rooms to every floor, modelled in…CommercialRiyadh, KSA
center3 JDC205, Jeddah
Chilled-water and roof MEP shop-drawing packages, and the architectural axonometric set for the C3DCI-JDC205 series.Data centresJeddah, KSA2025Send us one package.
Send a package and you get a scope, a fixed price and a delivery date within two working days.