BIM coordination
A federated model, a clash register that closes, and coordinated sections issued per trade before installation starts.
Clashes are resolved in the model, on a schedule, and the ceiling void is cleared before a hanger goes up.
Who this is for Main and EPC contractors, technical offices, and owners who need one coordinated source of geometry.
Price this scopeWhat you receive
Federated model, by zone
Architectural, structural and MEP models assembled to one coordinate system and split into zones a team can actually review.
Clash register that closes
Every clash carries an owner, a zone, a proposed resolution and a status. The register is issued with the model, not instead of it.
Coordinated service sections
Ceiling-void and service-corridor sections issued per trade, at the levels the installer will actually set out from.
Model-based quantities
Quantity extraction straight from the model for a tender BoQ, with the extraction rules written down so a figure can be traced.
As-built model and asset data
The model maintained through construction and handed over with COBie asset data the facility team can load.
BIM execution plan
Naming, levels of information need, the review protocol and the common data environment, agreed before anyone models anything.
The scope, at a glance
-
Revit modelling
Architectural, structural and MEP modelling in Autodesk Revit.
-
Steel detailing
Steel detailing models in Tekla Structures: fabrication-ready.
-
Clash detection
Multi-discipline clash detection in Navisworks, with a register that closes.
-
4D and 5D integration
4D construction sequencing and 5D quantity and cost integration.
-
Shop drawings and as-built
Shop drawings, fabrication drawings and as-built models.
-
BIM Execution Plan
BIM Execution Plan (BEP) and ISO 19650 implementation across the team.
-
Scan-to-BIM
Point cloud to BIM for renovations and verification of what is on site.
-
Quantity take-off
Quantity take-offs (QTO) extracted directly from the model, to XLSX, CSV or PDF.
- Accurate and coordinated Clash-free models cut errors and rework.
- Time and cost savings 4D/5D planning and model take-offs drive better decisions.
- Quality and reliability Standards-based delivery to ISO 19650.
- Collaborative delivery One source of truth for the whole project.
A federated model, a clash register that closes, and coordinated sections issued per trade before installation starts.
How it is produced
Set-up before modelling
Shared origin, naming, and the level of information need per stage are fixed first. Retrofitting them onto a live model is what makes coordination expensive.
Clashes are run by zone, on a cycle
A dated cycle per zone, with a report each round, so the register shrinks on a schedule rather than at the end.
Resolutions are engineered, not deferred
A route change is checked against the discipline that owns it before it is proposed, because a clash moved is not a clash closed.
One model feeds every output
Quantities, energy zones, credit evidence and the as-built all come from the same geometry, so they cannot drift apart.
Projects delivered under this service
9 projects

NEOM Sports Village
Structural steel and BIM production for the sports pavilion buildings, from construction-stage models to coordinated deliverables.Sports & eventsNEOM, KSA
Siemens Energy Manufacturing Hub
Tekla and BIM production models across the manufacturing hub buildings, coordinated from model to fabrication documentation, with steel…IndustrialDammam, KSA
MDLBEAST Event Bridge
A full Tekla production model and fabrication deliverables for the event bridge, with erection engineering for night lifts on a live site.Sports & eventsRiyadh, KSA
center3 JDC205, Jeddah
Chilled-water and roof MEP shop-drawing packages, and the architectural axonometric set for the C3DCI-JDC205 series.Data centresJeddah, KSA2025
Al Amal Hospital
The densest ceiling void in construction, cleared before a hanger went up. Architecture, structure and MEP federated into one model, and…HealthcareAbha, KSA
Event Tent, King Abdulaziz Stadium
A zig-zag steel tent structure modelled and detailed in Tekla, with erection-stage support on the live event site.Sports & eventsKing Abdulaziz StadiumSoftware
- Revit
- Navisworks Manage
- Autodesk Construction Cloud
- Solibri
- Dynamo
- Recap
Standards and codes
- ISO 19650
- COBie
- IFC 4
What the deliverable is
- RVT
- IFC 4
- NWD / NWC
- Coordinated PDF sets
- COBie XLSX
- BCF issue exchange
Deliverables
Pick a discipline and tick what you need. Send the selection and its indicative budget range appears on screen and arrives in your inbox.
| Deliverables | Unit |
|---|---|
| Federated model + clash detection, LOD 300 | per m² |
| MEP coordination model, LOD 350 | per m² |
| MEP coordination: hospital / data centre | per m² |
| Clash detection round + report | per round |
| Scan-to-BIM as-built, architectural + structural | per m² |
| Revit family / content creation | per family |
| BIM execution plan and standards setup | lump sum |
| Ongoing coordination retainer | per month |
Questions clients ask
We already have consultant models. Do you rebuild them?
No. We federate what exists and report what is missing for coordination. Rebuilding is only proposed where a model cannot carry the level of detail the trade needs.
What level of development do you work to?
It is set per stage and per system in the execution plan. Coordination of a ceiling void needs LOD 350 for the services and LOD 300 for the structure around them.
How is a clash counted as closed?
When the geometry is changed in the model that owns it and the next run no longer reports it. A note in the register is not a closure.
Can you work inside our own CDE and templates?
Yes, and that is the usual arrangement on a dedicated-team engagement. We work to your standards and hand everything back at closeout.

A question that is not here?
Ask the engineer who would run your project. Send the drawings and the answer comes back in writing.
Send us one package.
Send a package and you get a scope, a fixed price and a delivery date within two working days.
Related services
Steel structures
Connection design, fabrication detailing and shop drawings a fabricator can put on the machine without redrawing them.
Planning and controls
A programme that survives contact with the site, monthly progress against a baseline, and delay analysis that holds up.
LEED and green building
Hit your LEED and Mostadam targets with no surprises. Credits engineered into the design, evidence ready before the reviewer asks, and every comment…