Planning and controls
A programme that survives contact with the site, monthly progress against a baseline, and delay analysis that holds up.
You can see where the job actually is, and prove where it was when something moved.
Who this is for Contractors and developers who need a defensible programme, a monthly report, or support on an extension-of-time claim.
Price this scopeWhat you receive
Programme build and baseline
A work breakdown, logic, durations and resources, built to be approvable and then frozen as the baseline.
Monthly progress update and S-curve
Actual against baseline, the critical path as it stands, the variance, and what it would take to recover it.
4D sequence on the model
The programme linked to the federated model, so a sequence can be reviewed by looking at it rather than reading it.
Delay analysis and EOT support
A named method, the records it relies on, and the entitlement it supports, issued as a report, not an assertion.
Quantity take-off and BoQ
Measured take-off, from the model where a model exists, with the measurement rules stated so a rate can be checked.
The scope, at a glance
-
Project initiation
Scope, objectives and deliverables defined, with a charter the stakeholders agree.
-
Planning and scheduling
Detailed plans, schedules, milestones and resource plans on a clear baseline.
-
Cost management
Estimate, budget and control, with cash flow monitored against performance.
-
Risk management
Risks identified, assessed and ranked, with mitigation and contingency.
-
Resource management
The right people, plant and materials planned and allocated.
-
Communication management
Communications planned so information reaches the right party on time.
-
Quality management
Quality standards and processes, with audits and inspections that bite.
-
Procurement management
Procurement, supplier evaluation and contract administration.
-
Performance monitoring
Progress tracked, KPIs reported, and earned value that supports a decision.
-
Project closure
Deliverables completed, approvals obtained, contracts closed, lessons captured.
- Delivered on time Disciplined planning against a baseline.
- Quality first A quality-focused approach in every deliverable.
- Costs controlled Effective cost management that keeps a project inside its budget.
- Data-driven Data and tools behind every reported figure.
A programme that survives contact with the site, monthly progress against a baseline, and delay analysis that holds up.
How it is produced
Logic, not dates
The programme is driven by relationships and durations. Constraints are used sparingly and every one of them is listed.
Progress is measured, not estimated
Each activity gets a measurable completion rule at baseline, so an update is a reading rather than an opinion.
Records are kept as if there will be a claim
Because on most jobs there is, and a claim is only ever as strong as the contemporaneous record behind it.
Projects delivered under this service
1 projects
Software
- Primavera P6
- MS Project
- Navisworks (4D)
- Power BI
- Excel
Standards and codes
- AACE 29R-03
- SCL Delay Protocol
What the deliverable is
- P6 XER
- PDF Gantt
- S-curve and progress report
- BoQ XLSX
- 4D sequence video
Deliverables
Pick a discipline and tick what you need. Send the selection and its indicative budget range appears on screen and arrives in your inbox.
| Deliverables | Unit |
|---|---|
| Primavera P6 programme: build & baseline | lump sum |
| Monthly progress update & S-curve | per month |
| Delay analysis & EOT claim support | lump sum |
| Quantity take-off & BoQ | per m² |
Questions clients ask
Which delay analysis method do you use?
Whichever the records support: the method is chosen from what is actually available and it is named in the report, never left implicit.
Can you take over an existing P6 programme?
Yes. The first output is a health check on the schedule (open ends, negative float, constraint count) before anything is updated.
Do we need a BIM model for the 4D sequence?
Yes, and it does not have to be ours. Any federated model with usable object grouping can be linked to the programme.

A question that is not here?
Ask the engineer who would run your project. Send the drawings and the answer comes back in writing.
Send us one package.
Send a package and you get a scope, a fixed price and a delivery date within two working days.
Related services
BIM coordination
A federated model, a clash register that closes, and coordinated sections issued per trade before installation starts.
Steel structures
Connection design, fabrication detailing and shop drawings a fabricator can put on the machine without redrawing them.
LEED and green building
Hit your LEED and Mostadam targets with no surprises. Credits engineered into the design, evidence ready before the reviewer asks, and every comment…