Capability statement
What this office can carry, which codes it works to, how a package is produced and checked, and what arrives at handover. One page, written to be forwarded.
Nothing on this page is a claim we cannot show you. Every discipline links to what it produces and the standards it is produced to; every calculator links to the published worked example it is checked against.
The office
| Legal name | BIMLEED FOR TECHNICAL SERVICES |
|---|---|
| Founded | 2022 |
| Engineers and specialists | 25+ |
| Projects delivered | 75+ |
| Disciplines in house | 8: nothing brokered out |
| Head office | Riyadh, Saudi Arabia |
| Markets | Saudi Arabia · GCC |
| Published sectors | Sports & events · Industrial · Data centres · Infrastructure · Healthcare · Government & public realm · Commercial · Residential |
| Languages | العربية · English |
| Working week | Sunday to Thursday, Riyadh time (UTC+3) |
| Public calculator library | 15: each checked against a published worked example |
What we carry
| Discipline | What arrives | Worked to |
|---|---|---|
| Steel structures |
Send us a frame. You get a Tekla model, a designed connection set and drawings the shop can cut from. Tekla model · DWG · PDF sheet set |
AISC 360 · AISC 303 · ASCE 7 · SBC 301 |
| BIM coordination |
Clashes are resolved in the model, on a schedule, and the ceiling void is cleared before a hanger goes up. RVT · IFC 4 · NWD / NWC |
ISO 19650 · COBie · IFC 4 |
| LEED and green building |
Your green rating starts in the design, not in the paperwork. Credit forms and narratives · Simulation reports · Evidence register XLSX |
LEED v5 · Mostadam · SBC 1001 · SBC 601/602 |
| Structural design |
A structure that is sized, checked, drawn and defended, with the calculation behind every member on file. Calculation note PDF · DWG general arrangement · Bar bending schedule XLSX |
ACI 318 · AISC 360 · ASCE 7 · SBC 301 |
| Mechanical |
Mechanical drawings coordinated, priced and formatted for the reviewer who has to approve them. Revit model · DWG layouts · Load calculation PDF |
ASHRAE 90.1 · ASHRAE 62.1 · SBC 501 · SBC 601 |
| Electrical |
An electrical package a utility reviewer, a contractor and a commissioning team can all work from. DWG layouts · Single-line diagrams · Load schedules XLSX |
NFPA 70 / NEC · IEC 60364 · BS 7430 · NFPA 780 |
| Architectural |
Drawings that describe a building which can actually be built, priced and approved. Revit model · DWG drawing set · PDF issue set |
SBC 201 · SBC 801 · SBC 901 · NFPA 101 |
| Planning and controls |
You can see where the job actually is, and prove where it was when something moved. P6 XER · PDF Gantt · S-curve and progress report |
AACE 29R-03 · SCL Delay Protocol |
Codes and standards worked to
Aggregated from the service pages and the calculator library: every entry below is cited on a page of this site that names the clause it comes from.
Software
How a package runs
-
01
Scope
You send a package. Scope, fixed price and a delivery date come back within two working days.
-
02
Set up
Standards, templates, naming and the review protocol agreed. One named project lead assigned.
-
03
Produce
Modelling, design and detailing, with progress visible to you inside the model, not only in a report.
-
04
Coordinate
Clash detection by zone, discipline reviews, and a clash register that is closed out rather than reported.
-
05
Issue and defend
Drawings issued for review, and comments answered by the engineer who produced the work.
-
06
Hand over
As-built model, COBie data, calculation notes and every native file: all handed to you.
How to engage us
| Package delivery | Fixed scope, fixed fee: one discipline or one work package. |
|---|---|
| Full project engineering | A fixed fee against an agreed deliverables schedule. |
| Dedicated engineering team | Per engineer, per month: your tools, your standards, released at closeout. |
| Peer review and second opinion | A fixed fee for an independent read on a design, a model or a submission before you commit. |
What happens before it leaves the office
- A second engineer signs the check: No drawing and no calculation note leaves on the strength of the person who produced it. The check is recorded on the document.
- Software confirms, it does not decide: A hand check on the scheme comes before the model. Reactions, deflections and equilibrium are verified before any member is sized.
- Assumptions are stated, not carried: Every calculation note opens with its design conditions and its clause references, because a note a reviewer cannot follow is a note that comes back.
- Comments are answered by the author: A reviewer comment goes back to the engineer who produced the work, and the model or the note is corrected before the reply is written.
- Nothing is claimed that cannot be evidenced: No certification count, no project count that has not been delivered, and no client named without written permission.
The public calculator library
Free, public, and checked in front of the visitor: each tool runs its published worked examples in your own browser and prints the deviation. It is the cheapest way to judge whether an office knows the code it quotes.
| Calculator | Standards | Last verified |
|---|---|---|
| Steel Weight Take-Off | EN 10365 · DIN 1026-1 · ISO 6935-2 · EN 1991-1-1 | 2026-09-24 |
| Section Properties | EN 10365 · DIN 1026-1 · AISC ASD 1989 · AISC 360 | 2026-09-24 |
| U-Value & Thermal Envelope | ISO 6946 · ISO 10456 · SBC 601 · SBC 602 | 2026-09-24 |
| Concrete Volume & Mix | IS 10067 · ACI 211.1 | 2026-09-24 |
| Rebar Estimator | ISO 6935-2 · ACI 318-19 · BS 8666 · EN 1992-1-1 | 2026-09-24 |
| Lifting Lug Design | AISC 360-16 · ASME BTH-1-2020 | 2026-09-24 |
| Cold-Formed Steel Design | AISI S100-16 · AS/NZS 4600 · ASCE/SEI 7-22 · AS/NZS 1170.0 | 2026-09-24 |
| LEED Scorecard | LEED v5 BD+C · LEED v4.1 BD+C | 2026-09-24 |
| LEED Indoor Water Use Reduction | LEED v4.1 BD+C · LEED v4 BD+C | 2026-09-26 |
| Room Air-Conditioner Size | ASHRAE Handbook: Fundamentals · SASO 2663:2021 | 2026-09-26 |
| Rooftop Solar PV: Size and Savings | NREL PVWatts Version 5 · SERA ERD-TA-012 | 2026-09-27 |
| Steel Beam Design: AISC 360-16 | AISC 360-16 · ASCE/SEI 7-22 · EN 10365 · EN 10025-2 | 2026-09-27 |
| Engineering Unit Converter | NIST SP 811 · SI Brochure · ASTM B258 · IEC 60228 | 2026-09-27 |
| Embodied Carbon of the Structure: LEED v5 | LEED v5 BD+C · ISO 21930 · EN 15804+A2 · ISO 14025 | 2026-09-28 |
| ISO 19650 File Naming: Generator and Checker | BS EN ISO 19650-2 · UK National Annex | 2026-09-28 |
Talk to us
| a.abolilah@bimleed.com | |
| Phone | +966 53 052 3100 |
| Website | bimleed.com |
| linkedin.com/company/bimleed | |
| YouTube | youtube.com/@BIMLEED |
If a scope is not on this page, ask. The answer is either yes with evidence, or no.















