Projects
Case studies written for the person who has to evaluate them: the brief, the constraint, what we delivered, the standards that governed it and the deliverable list. Where a figure has not been signed off by the client it is marked as awaiting sign-off rather than filled in.
25 projects

center3 JDC205, Jeddah
Chilled-water and roof MEP shop-drawing packages, and the architectural axonometric set for the C3DCI-JDC205 series.Data centresJeddah, KSA2025
Al Amal Hospital
The densest ceiling void in construction, cleared before a hanger went up. Architecture, structure and MEP federated into one model, and…HealthcareAbha, KSA
Taya Industrial City
An industrial city's utility corridors, resolved before excavation. Site-wide electrical network design, street lighting verified in…InfrastructureRiyadh, KSA
ZHI Headquarters
LEED BD+C consultancy for a Jeddah headquarters: 80 of 110 points on the published scorecard, carried by energy, materials, daylight and…CommercialJeddah, KSA
SBF Factory
Factory buildings designed across architecture, structure, MEP and Civil Defense systems, with a coordinated IFC model and design visuals…IndustrialRiyadh, KSA
Cool-Wall Coating: Comparative Energy Study
Two identical EnergyPlus models of a Riyadh office, differing only in wall-finish optics: 33.4 °C off the peak wall temperature and 12,040…CommercialRiyadh, KSA











